Our mission

Envisioning a future where technology and business coalesce

The ocean of technological possibilities is vast and infinite. Our vision is to sail toward a horizon where technology is not just a tool but a strategic partner that propels businesses into new realms of success and innovation.

PROJECT LOGISTICS

Loading Oversized Containers at Westport

HP and LP dosing skids systems weighing 250 tonnes and ranging up to 11 meters in height and length were transported. The necessary things such as temporary dismantling of electrical cables and driving in the opposite direction to avoid obstacles were done.

SEA FREIGHT

China Reels Transportation

Freezing conditions have been known to paralyze river shipping operations in several parts of the world. Oversized reels weighing about 200 tonnes were required to be transported in sub-zero temperatures from China to Pasir Gudang, Malaysia.

LAND FREIGHT

PVC Plant Transportation

PVC plant weighing a total of 16,000 tonnes were dismantled in Kerteh and transported to Mumbai, India to be reassembled. The entire process took 150 days from start to finish with no errors or breach of safety measures.

Case Study
2 Unit Reels CW Flexible Pipelines

POL : Taicang, China

POD : Johor, Malaysia

Industry: Oil & Gas

Volume : 4 PKGS / 341 MT / 1,357.51 M3

Heaviest Cargo : 10.00m Length x 6.77m Width x 10.00m Height / 170 Tonnes

Scope of Work : Custom Clearance, Port Handling, Vessel Chartering, Storage & Shifting

Tera has been appointed to transport 2 units of Flexible Pipeline Reel along with some accessories, from Binzhou, China, to Johor Bahru, Malaysia.

This shipment comprises four packages, with the largest piece measuring 10.0 meters in length, 6.77 meters in width, and 10.0 meters in height.

All four packages were loaded at the client’s private jetty in Binzhou, China and eventually lifted and loaded onto a self-propelled Barge utilizing a 350 ton capacity floating crane.

The self-propelled Barge then departed to Taicang Port to undergo a ship-to-ship transfer (STS) operations.

Upon arrival at Taicang Port, the self-propelled Barge berthed alongside chartered Heavy Lift Vessel to carry out the STS operations.

Subsequently, the HLV departed to Johor Port to unload the reels onto a double wide multi-axle trailer. The laden MAT then shifted and jacked down the reels onto concrete stools at the temporary storage yard in Johor port. Following this, the reels were jacked up, shifted from the temporary storage yard to the wharf side, and then lifted and loaded onto a Multi-Purpose Offshore Vessel utilizing the vessel crane.

35t Offshore Pedestal Crane Ex PKL to Labuan

POL : Port Klang, Malaysia

POD : Labuan Shipyard, Malaysia

Industry: Oil & Gas

Volume : 5 PKGS / 36 MT / 703.617 M3

Heaviest Cargo : 23.8 m (Length) x 6.0 m (Width) x 4.7 m (Height) / 35 Tonnes

Scope of Work : Barging, Lifting, Loading, Sea Fastening & Unloading

Tera has been appointed to deliver 1 unit 35 ton Offshore Pedestal Crane along with accessories ex Port Klang to Labuan for SHELL TIMI Project.

There were 5 packages with a total weight of 36 mt & volume of 703.617 cbm with the largest piece of cargo measuring at 23.8 (L) x 6.0 (W) x 4.7 (H) meter.

Client has decided to go on full charter. Hence Tera supplied a 250ft barge pair with 1,200hp tugboat for this project.

All the cargoes were stationed at the client’s private jetty before it was lifted & loaded onto the barge with a 250 ton capacity barge crane.

Upon completion of loading, the cargoes were secured on the barge deck, fastened, and set sail to Labuan Shipyard in East Malaysia.

After berthing alongside Labuan Shipyard, barge crew performed unfastening & hooking on scope. The cargoes were unloaded using a 198 ton capacity Manitowoc ringer crane at the shipyard.

Tera is working on the 2nd leg to load the Offshore Pedestal Crane onto a dedicated PSV & arrange seafastening before it is being delivered & installed onto the intended offshore platform.

6 Unit Filtered Water Tanks

Collection Point : Nilai, Malaysia

Delivery Point : Samsung Plant Senawang, Malaysia

Industry : Infrastructure

Volume : 6 UNITS / 13.4 MT / 757.166 M3

Heaviest Cargo : 6.0 m (Length) x 4.9 m (Width) x 4.9 m (Height) / 2.5 Tonnes

Scope of Work : Inland Transportation, Lifting, Loading, Securing & Unloading

Tera has been appointed by one of our customer to deliver 6 x units of Water Tank along with required accessories ex Nilai, Malaysia to Senawang, Malaysia for SAMSUNG SDI ENERGY PLANT Project.

All in there were 6 packages with the largest piece measuring at 6.0 (L) x 4.9 (W) x 4.9 (H) meter.

All the cargoes were stationed at the client’s premises before it was lifted & loaded onto our Vessel Bridge Trailer – (as seen in above).

The delivery took place at night to avoid the traffic congestion during daytime.

Upon arrival at the final site, the scope of unlashing and unloading were executed accordingly and offloaded using a mobile crane at the Samsung Plant site in Senawang, Malaysia.

Favelle Favco - PC1200 Offshore Pedestal Adaptor

POL : Port Klang, Malaysia

POD : Sungdong Shipyard, Korea

Industry: Oil & Gas

Volume : 9 PKGS / 643.7 MT / 3,614.14 M3

Heaviest Cargo : 18.5 m (Length) x 15.0 m (Width) x 12.7 m (Height) / 605 Tonnes

Scope of Work : Barging, Ballast + RORO Operations, Vessel Chartering, Double Banking Operations, Loading, Sea Fastening & Unloading

Date : 16th February 2023

We pick up cargo from client location, transporting the heaviest piece using SPMT to a private jetty nearby and load onto Barge (RORO operation).

This unit then carry by barge to nearest port (Port Klang West) and load (Double banking operation) onto a HLV that we chartered.

The unit was secured on deck, sea fastening and set sail to destination: Korea shipyard